Background Information
This 3 bedroom semi-detached property was purchased in 2010 as a repossessed property and
was in a very poor state of repair. It required extensive refurbishment including:
Re-plastering throughout
Re-decorating throughout
New Bathroom (See Photo's below)
New Kitchen (See Photo's below)
New soffit boards and guttering throughout
Structural repairs:


Other work included:
Conversion of outhouses to become the utility room
New UPVC Front and back doors
After completion, the property was then put on the market and subsequently sold.
Here are the before and after shots:
Entrance Hall Before
Entrance Hall After




Lounge Before
Lounge After






Dining Room Before
Dining Room After




Kitchen Before


Kitchen After


Utility Before
Utility After








Landing Before
Landing After




Bathroom Before

Bathroom After







Bedroom 1 Before
Bedroom 1 After






Bedroom 2 Before
Bedroom 2 After






Bedroom 3 Before
Bedroom 3 After






Outside Before


Outside After